    ASX Announcement: 17/08/2016

    LOMERO FARM IN AND JOINT VENTURE AGREEMENT WITH WFE

    (ASX:KDL) Kimberley Diamonds Ltd (KDL) is pleased to announce that it has entered into a Farm In and Joint Venture Agreement with ASX listed Winmar Resources Limited in relation to KDL's Lomero copper-gold project in Spain (Lomero Project). KDL has recently put the Lerala Diamond Mine in Botswana in production. The transaction with WFE will allow KDL to focus on diamond mining and sales.

    KDL and WFE have entered into a farm in and joint venture arrangement for the Lomero Project on the following key terms:

    On execution of the JVA and payment of a condition precedent payment of AUD$200,000, WFE has a right to earn up to a 70% interest in the tenements over a 3 year period, starting 13 May 2016.
    WFE must acquire an initial 10% by spending 400,000 in Year 1 (First Commitment).
    WFE may then elect to acquire a further 35% interest (for a total 45% interest) by spending 3 million in Year 2.
    WFE may then elect to acquire a further 25% interest (for a total 70% interest) by spending a further 2 million in Year 3.
    WFE may withdraw at any time after the First Commitment has been completed. If WFE withdraws during Years 2 or 3, its interest earned to date will revert back to KDL.

    The arrangement with WFE will meet the expenditure requirements for the Lomero Project for the initial three years. KDL will retain a 30% interest in the project, thereby providing its shareholders with continued exposure to the project and to copper-gold markets. KDL looks forward to working with WFE to progress the Lomero Project. Mr Rod Sainty, a former Director of KDL, has been appointed by WFE as Managing Director and will lead the Lomero exploration program for WFE.
     
  2. VRS

    VRS Well-Known Member Silver Stacker

    Joined:
    Oct 3, 2011
    Messages:
    5,164
    Likes Received:
    92
    Trophy Points:
    48
    Location:
    Brisbane
    A bit of historical info from HC - Lomero-Potayos is now controlled by WFE:

    On May 14, 2013, Petaquilla Minerals announced that the latest step in the advancement of the Lomero- Poyatos gold project in Spain, specifically that the construction of a mine access ramp has begun. The Lomero-Poyatos project is currently at the exploration stage with an inferred mineral resource estimate based primarily on historical drill-hole data of the 124 known drill holes. Completed by Behre Dolbear in May 2012, the revised NI 43-101-compliant report estimates an inferred resource of approximately 830,000 ounces Au and 17.3M ounces Ag (6.07 million tonnes at an average grade of 4.25 g/t Au at a 1.0 g/t Au cut-off and 88.74 g/t Ag) in an underground mining scenario at Lomero-Poyatos.

    Thus far, Petaquilla has completed the first phase of twin drilling of historical holes, and the ramp will allow for additional twin drilling which also will contribute to upgrading the existing NI 43-101-compliant inferred resource estimate to the measured and indicated categories. In addition, the ramp will permit the infill drilling recommended by the NI 43-101 technical report, namely the drilling of holes at 50 meter intervals along N-S lines 100 meters apart.

    Petaquilla Minerals acquired a 100% interest in the Lomero-Poyatos concessions through the acquisition of Iberian Resources in late August 2011; the titling process was completed in November 2012. Having secured the initial environmental permit to dewater the pit and the submerged galleries, along with the Andalusian Autonomous Government's administrative authorization, Petaquilla has already completed the construction of a project office building and improved roads on the property.

    Located in the Huelva Province of Spain, Lomero-Poyatos is approximately 85 kilometers northwest of Seville and 60 kilometers north of the major port of Huelva. The mining complex includes two open pits (one at Lomero and the other at Poyatos) and a six level underground mine with a central shaft between the open pits. Lomero-Poyatos was mined continuously from 1905 to 1982 solely as a sulphide (pyrite) mine. At least 2.6 million tonnes of massive sulphide ore was mined for pyrite content, which was smelted to manufacture sulfuric acid. Since then, several companies, including the pyrite smelter, have investigated Lomero-Poyatos as a possible gold-silver deposit and/or a base metal (copper-lead-zinc) deposit.

    Lomero-Poyatos contains two independent ore bodies (Lomero and Poyatos) that form a single ore body at depth, over 800 meters in strike. Initially, each ore body was opened to the surface by small open pit mines. Later, in the twentieth century, a main shaft and an underground mine complex with at least six levels that intersected both ore bodies was developed. The underground mine has been flooded for about 20 years. Petaquilla has prepared for dewatering the mine by conditioning a 300 meter deep tap through which the water can be removed.
     
  3. miniroo

    miniroo Well-Known Member Silver Stacker

    Joined:
    Jun 21, 2012
    Messages:
    1,042
    Likes Received:
    84
    Trophy Points:
    48
    Location:
    Victoria
    This is gonna fly soon, it's currently .003
     
  4. VRS

    VRS Well-Known Member Silver Stacker

    Joined:
    Oct 3, 2011
    Messages:
    5,164
    Likes Received:
    92
    Trophy Points:
    48
    Location:
    Brisbane
  5. VRS

    VRS Well-Known Member Silver Stacker

    Joined:
    Oct 3, 2011
    Messages:
    5,164
    Likes Received:
    92
    Trophy Points:
    48
    Location:
    Brisbane

Share This Page